EIFS (Dryvit) Hail Damage Repair – St. Charles, MO
June 8, 2018First Baptist Church Harvester in St. Charles, MO was hit very hard by a large hail storm. Much of the EIFS on the building was damaged from the hail as well as the roof, metal siding, trims, and windows. We were asked to consult as the plastering contractor on the project with the EIFS repairs and have began with resurfacing damaged areas and patching EIFS at other areas depending on the extent of the damage. After resurfacing, the walls look brand new and are water tight.




Dryvit New Brick Used to Modernize Firestone Store – Clayton, MO
January 26, 2018Westwood Contractors selected George Weis Company as the plastering EIFS (Dryvit) contractor on the Clayton, MO Firestone Store renovation off Forsyth Blvd. The existing building is being retrofitted to match the newer building adjacent to it using a new product called New Brick by Dryvit. The before and after pictures show are dramatic change and upgrade to the facade. See below for progress pictures.
Also here’s a good description of how the new product works.













New Pictures added 2.7.18:












Stucco Completed at Raising Canes – Florissant, MO
January 22, 2018We were selected by Mapp Construction the general contractor as the metal lath and stucco contractor on the new Raising Canes restaurant in Florrisant, MO. The store has been completed and is open for business selling their world famous chicken fingers.






Daniel Boone Library Renovation – Drywall and Trespa Meteon
January 9, 2018George Weis Company has completed work on the Daniel Boone Library in Ellisville, MO. The project consisted of a complete interior renovation as well as a 10,000 square foot addition. Our work comprised of metal studs, drywall, taping, acoustical ceilings, and Trespa Meteon (red exterior cladding in pictures). (Pictures courtesy of SLCL)




Sunset Hills, MO Residence – EIFS (Dryvit) Completed
January 4, 2018Before the weather dropped to below freezing, we were able to complete the EIFS on this gorgeous modern home in Sunset Hills.
Pictures to follow
Ladue Horton Watkins High School Terracotta Installation Continues
October 20, 2017We were selected by SM Wilson as the terracotta installer on the remodel and addition to the Ladue Horton Watkins High School. Progress is ongoing on the project and the terracotta rain screen system is looking great.
NBK is the manufacturer of the terracotta system.




Bridgeton Trails Library Renovation
October 4, 2017George Weis Company is pleased to announce the completion of the Bridgeton Trails Library renovation located in St Louis, MO. The branch underwent a complete interior renovation and our work included the steel studs, drywall, taping, and acoustical ceilings. We also re-plastered (EIFS) the exterior soffit around the entire building. (Pictures courtesy of SLCL)




Shoppes at Mid Rivers St. Peters, MO – EIFS Contractor
September 29, 2017We have recently completed the EIFS on the new Shoppes at Mid Rivers project in St. Peters, MO. We were selected as the plastering contractor by Knoebel construction to work on the new 270,000 SF shopping center. Due to the very aggressive schedule, the EIFS was divided into three phases. Our phase was for three of the roughly eight tenants.

Burger King – Belleville, IL EIFS Plaster completed
September 25, 2017We have recently completed the new Burger King in Belleville, IL. We worked closely with Earll Construction on the project as the plastering contractor installing the EIFS on the building. Pictures of new building to follow.


St. Louis, MO St. Marks Church Remodel
June 5, 2017We were selected by Musick Construction as the plastering contractor and drywall contractor on the new St. Mark’s Church addition and remodel at 4230 Ripa Ave, St. Louis, MO 63125. Our scope of work includes metal stud framing, plastering and plaster repair, GRG ornate cornice work, insulation, stucco, EIFS, and acoustical ceilings.
With the project including a complete remodel of the Nave portion of the church, quality craftsmanship was required in order to install the ornate plaster cornice (made of GRG) throughout the project. Project started in early 2017, progress pictures below.