FNB Steeleville – EIFS Contractor Steeleville, IL
January 23rd, 2015
George Weis Company was chosen as the EIFS plastering contractor to install EIFS (Dryvit), steel stud framing, sheathing, drywall, taping, plastering, acoustical ceilings (drop ceilings), and insulation by LaMacchia Group out of Wisconsin on the new First National Bank of Steeleville project in Steeleville, IL. Work is currently underway and is scheduled to be complete […]
Touchette Hospital Plastering Contractor
January 16th, 2015
George Weis Company was chosen as the EIFS plastering contractor to install EIFS (Dryvit) as well as the steel stud framing, sheathing, drywall, and insulation on a the Touchette Hospital addition/renovation in East St. Louis, IL by Holland Construction. Project is currently underway and is schedule to be complete in 2016.